Rapid Deployable Structures. Operational in Hours.
The Complete Rapid Structures Range.
Norwegian Engineering. Mission-Ready Performance.
Deployment Matched to Scale
Built for Temporary Sites
Modular Mission Configuration
Transport, Recover and Redeploy
Choose the Right Rapid Structure for Your Mission
Select by operational role, required floor area, deployment window, transport method and environmental conditions. Nordic Deployment engineers can recommend a standard system or mission-specific configuration based on your personnel, equipment and site requirements.
Configure the Facility Around the Operation
Match internal space and access to the people and assets the structure must support. Medical layouts can prioritize treatment zones and climate control; command and workshop configurations can accommodate equipment, lighting and cable routes; accommodation layouts can be scaled by occupancy; aviation systems can be specified around aircraft dimensions, door clearance and maintenance access.
D-Dome Modular Building System
Create scalable field infrastructure for hospitals, command centers, workshops, offices, storage and accommodation. The D-Dome inflatable modular building system is available in square and rounded profiles, with modular footprints from 16 to 360 m² and optional lighting, HVAC and access configurations.
D-Dome Inflatable Flight Hangar
Protect and support aircraft at remote or temporary operating locations. The D-Dome inflatable flight hangar uses connected inflatable modules and can be configured for fighter aircraft, including F-16 and JAS 39 Gripen applications, with optional end walls, personnel doors and a folding front gate.
D-Block Nordic Cabin
Provide compact rest, recovery, first-aid or small-team accommodation close to the point of need. One-person and three-person models offer sealed construction, battery-powered inflation and connections for ventilation or portable climate control.
From Requirement to Deployable Configuration
Share the intended use, required internal dimensions, deployment site, climate, transport constraints, crew availability and accessories. The engineering team will confirm the suitable structure, module count, anchoring approach, equipment package and deployment plan before quotation.
Frequently Asked About Rapid Structures.
How quickly can the structures be deployed?
Which rapid structure should I choose?
What site preparation is required?
Can the structures be moved and reused?
Yes. The systems are designed to be deflated, packed, transported and redeployed. Recovery procedures, packing method and lifting or transport equipment depend on the selected model and accessories.